Communications N220 Guia de Instalação Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
Meikai ENERGY
Page 12 Copyright MeiKai ENERGY 2012 REV 1.0
Step 4-Grounding the system
NOTE: If you already use grounding washers to ground the micro-inverter to the PV
module racking as described in step 1, skip this step.
Each Meikai Micro-inverter comes with a ground screw with a diameter of 5mm.
Check your local code for grounding conductor sizing requirement. Connect the grounding electrode
conductor to the micro-inverter ground screw.
Step 5-Connect the PV modules
NOTE: Completely install all Micro-inverters and all system inter-wiring connections
prior to installing the PV modules.
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 23 24

Comentários a estes Manuais

Sem comentários